>
The Theater:

Located among the cast iron buildings of SoHo at 55 Mercer Street (corner of Broome Street), the new theater was designed by Founding Artistic Director David Fishelson, along with architect Allan Thaler, former general manager Matt Irvin and original production manager Patrick Heydenburg.

The 140-seat theater still has a 22' wide by 30' deep stage and a state of the art lighting and sound system. In addition, public spaces are wheelchair-accessible and fully air-conditioned.

The site was previously home to the theater + gallery known as “Synchronicity Space”, and is now the new home of award-winning theater company The Culture Project.
Home 2004-5 Season MET Productions About MET The Theater David Fishelson Contact Us
© 2000-2008, Manhattan Ensemble Theater, Inc.
All rights reserved.